Draft Details
- Medical gas pipeline systems — Part 1: Pipelin...
- CSA Z7396.1:22
- Legal Notice for Draft Amendments
- Preface
- + 1 Scope
- 1.1 General
- 1.2 Intended use
- 1.3 Application
- 1.4 Exclusion of plume evacuation systems (PES)...
- 1.5 Exclusion of hyperbaric chambers
- 1.6 Exclusion of veterinary and animal research...
- 1.7 Terminology
- 1.8 Units of measure
- 2 Reference publications
- 3 Definitions
- + 4 General requirements
- 4.1 Pipeline safety
- 4.2 Health care facility’s formulary
- 4.3 Medical gases for patient care only
- 4.4 Medical gases not for patient care
- 4.5 Installation and performance requirements
- 4.6 Laboratory medical gases used exclusively f...
- 4.7 Animal laboratories
- 4.8 Dental clinics
- 4.9 Small, standalone medical gas pipeline syst...
- 4.10 Components exposed to pressure
- 4.11 Emergency management program
- 4.12 Additional design considerations
- + 5 Supply systems
- + 5.1 General
- 5.1.1
- 5.1.2
- 5.1.3
- 5.1.4
- 5.1.5
- 5.1.6
- + 5.2 Control equipment
- 5.2.1 Shut-off valves
- + 5.2.2 Regulators
- 5.2.2.1
- 5.2.2.2
- 5.2.2.3
- 5.2.2.4
- 5.2.3 Pressure indicators
- + 5.2.4 Pressure relief device (PRD)
- 5.2.4.1
- 5.2.4.2
- 5.2.4.3
- 5.2.4.4
- 5.2.4.5
- 5.2.5 Alarm sensors
- + 5.3 Portable cylinder supply systems (high pres...
- 5.3.1
- 5.3.2
- 5.3.3
- 5.3.4
- 5.3.5
- 5.3.6
- 5.3.7
- 5.3.8
- 5.3.9
- + 5.4 Stationary liquid supply systems (bulk syst...
- + 5.4.1 General
- 5.4.1.1
- 5.4.1.2
- + 5.4.2 Sources
- 5.4.2.1
- 5.4.2.2
- + 5.4.3 Control equipment
- 5.4.3.1
- 5.4.3.2
- 5.4.3.3
- 5.4.3.4
- 5.4.3.5
- + 5.5 Medical air supply systems
- + 5.5.1 General
- 5.5.1.1
- 5.5.1.2
- + 5.5.2 Compressor-based supply systems for medic...
- 5.5.2.1 General
- 5.5.2.1.1
- 5.5.2.1.2
- 5.5.2.1.3
- 5.5.2.1.4
- 5.5.2.1.5
- 5.5.2.1.6
- 5.5.2.1.7
- 5.5.2.2 Compressors
- 5.5.2.2.1
- 5.5.2.2.2
- 5.5.2.2.3
- 5.5.2.3 Air compressor piping and control compo...
- 5.5.2.3.1
- 5.5.2.3.2
- 5.5.2.3.3
- 5.5.2.3.4
- 5.5.2.3.5
- 5.5.2.3.6
- 5.5.2.4 Control panels and alarm sensors
- 5.5.2.4.1
- 5.5.2.4.2
- 5.5.2.4.3
- 5.5.2.4.4
- 5.5.2.5 Receivers
- 5.5.2.6 Drying and filtration units
- 5.5.2.6.1
- 5.5.2.6.2
- 5.5.2.6.3
- 5.5.2.6.4
- 5.5.2.6.5
- + 5.6 Medical vacuum systems
- + 5.6.1 General
- 5.6.1.1
- 5.6.1.2
- 5.6.1.3
- 5.6.1.4
- 5.6.1.5
- + 5.6.2 Vacuum piping and control components
- 5.6.2.1 General
- 5.6.2.1.1
- 5.6.2.1.2
- 5.6.2.1.3
- 5.6.2.1.4
- 5.6.2.1.5
- 5.6.2.1.6
- 5.6.2.2 Control panels and alarm sensors
- 5.6.2.2.1
- 5.6.2.2.2
- 5.6.2.2.3
- 5.6.2.2.4
- 5.6.3 Receivers
- + 5.7 Oxygen concentrator systems
- + 5.7.1 General
- 5.7.1.1
- 5.7.1.2
- 5.7.1.3
- 5.7.1.4
- 5.7.1.5
- 5.7.1.6
- 5.7.1.7
- 5.7.1.8
- 5.7.1.9
- 5.7.1.10
- + 5.7.2 Oxygen concentrator
- 5.7.2.1
- 5.7.2.2
- 5.7.2.3
- 5.7.3 Oxygen storage vessel
- + 5.7.4 Quality analyzers
- 5.7.4.1
- 5.7.4.2
- 5.7.4.3
- + 5.7.5 Oxygen concentrator piping and control co...
- 5.7.5.1
- 5.7.5.2
- 5.7.5.4
- 5.7.5.5
- + 5.7.6 Control panels and alarm sensors
- 5.7.6.1
- 5.7.6.2
- 5.7.6.3
- 5.7.6.4
- 5.7.6.5
- 5.7.6.6
- 5.7.6.7
- + 5.8 Instrument air supply systems
- + 5.8.1 General
- 5.8.1.1
- 5.8.1.2
- 5.8.2 High-pressure cylinder instrument air sup...
- + 5.8.3 Compressor-based supply systems for instr...
- 5.8.3.1 General
- 5.8.3.2 Piping and control components
- 5.8.3.2.1
- 5.8.3.2.2
- 5.8.3.3 Supply system components and operation
- 5.8.3.3.1
- 5.8.3.3.2
- 5.8.3.3.3
- 5.8.3.4 Control panels and alarm sensors
- 5.8.3.4.1
- 5.8.3.4.2
- 5.8.3.4.3
- 5.8.3.5 Receivers
- 5.8.3.6 Instrument air quality
- 5.8.3.6.1
- 5.8.3.6.2
- 5.8.3.6.3
- 5.8.3.6.4
- 5.8.3.6.5
- 5.8.3.6.6
- + 5.9 Location of supply system components
- + 5.9.1 General
- 5.9.1.1
- 5.9.1.2
- 5.9.1.3
- 5.9.1.4
- 5.9.1.5
- 5.9.1.6
- 5.9.1.7
- 5.9.2 Outdoor enclosures
- + 5.9.3 Rooms
- 5.9.3.1 General
- 5.9.3.1.1
- 5.9.3.1.2
- 5.9.3.1.3
- 5.9.3.1.4
- 5.9.3.1.5
- 5.9.3.1.6
- 5.9.3.2 Ventilation
- 5.9.3.2.1
- 5.9.3.2.2
- 5.9.3.2.3
- 5.9.3.3 Mechanical supply systems
- 5.9.3.3.1
- 5.9.3.3.2
- + 5.10 Anaesthetic gas scavenging system (AGSS)
- + 5.10.1 General
- 5.10.1.1
- 5.10.1.2
- 5.10.1.3
- 5.10.1.4
- + 5.10.2 AGSS vacuum producers
- 5.10.2.1 General
- 5.10.2.2 Oil-less claw
- 5.10.2.3 Water-sealed
- + 5.10.3 AGSS piping and control components
- 5.10.3.1 General
- 5.10.3.1.1
- 5.10.3.1.2
- 5.10.3.1.3
- 5.10.3.1.4
- 5.10.3.1.5
- 5.10.3.1.6
- 5.10.3.2 Control panels and alarm sensors
- 5.10.3.2.1
- 5.10.3.2.2
- 5.10.3.2.3
- 5.10.3.2.4
- + 5.10.4 Receivers
- 5.10.4.1
- 5.10.4.2
- + 6 Monitoring and alarm systems
- + 6.1 General
- 6.1.1
- 6.1.2
- + 6.2 Monitoring and alarm systems for supply sys...
- + 6.2.1 General
- 6.2.1.1
- 6.2.1.2
- 6.2.1.3
- 6.2.1.4
- 6.2.2 Supply system alarms
- + 6.2.3 Pipeline distribution system pressure ala...
- 6.2.3.1
- 6.2.3.2
- 6.2.3.3
- 6.2.3.4
- + 6.2.4 Supply system alarms
- 6.2.4.1 General
- 6.2.4.1.1
- 6.2.4.1.2
- 6.2.4.1.3
- 6.2.4.1.4
- 6.2.4.2 Auditory signals
- 6.2.4.2.1
- 6.2.4.2.2
- 6.2.4.2.3
- 6.2.4.3 Visual indicators
- 6.2.4.3.1
- 6.2.4.3.2
- 6.2.4.3.3
- 6.2.4.3.4
- 6.2.4.4 Surveillance
- + 6.3 Monitoring and alarm systems for nominal pi...
- + 6.3.1 General
- 6.3.1.1
- 6.3.1.2
- 6.3.1.3
- 6.3.1.4
- 6.3.1.5
- 6.3.1.6
- 6.3.1.7
- 6.3.1.8
- + 6.3.2 Auditory signals
- 6.3.2.1
- 6.3.2.2
- 6.3.2.3
- + 6.3.3 Visual indicators
- 6.3.3.1
- 6.3.3.2
- 6.3.3.3
- 6.3.3.4
- 6.3.3.5
- 6.3.4 Pressure indicators
- 6.3.5 Surveillance
- + 7 Pipeline distribution system
- + 7.1 Materials
- + 7.1.1
- 7.1.1.1
- 7.1.1.2
- 7.1.1.3
- 7.1.1.4
- 7.1.2
- 7.1.3
- 7.1.4
- 7.1.5
- 7.1.6
- 7.1.7
- 7.1.8
- + 7.2 Sizes
- 7.2.1
- 7.2.2
- 7.2.3
- + 7.3 Fittings
- 7.3.1
- 7.3.2
- 7.3.3
- + 7.4 Joints
- 7.4.1
- 7.4.2
- 7.4.3
- 7.4.4
- 7.4.5
- 7.4.6
- 7.4.7
- 7.4.8
- + 7.5 Flexible connecting assemblies
- 7.5.1
- 7.5.2
- 7.5.3
- + 7.6 Terminal units, junction points, and hyperb...
- 7.6.1
- 7.6.2
- 7.6.3
- 7.6.4
- 7.6.5
- + 8 Shut-off valves
- + 8.1 General
- 8.1.1
- 8.1.2
- 8.1.3
- 8.1.4
- 8.1.5
- + 8.2 Service isolation valves
- 8.2.1
- 8.2.2
- 8.2.3
- 8.2.4
- 8.2.5
- 8.2.6
- 8.2.7
- + 8.3 Zone valves
- 8.3.1
- 8.3.2
- 8.3.3
- 8.3.4
- 8.3.5
- 8.3.6
- 8.3.7
- 8.3.8
- 8.3.9
- 8.3.10
- 8.3.11
- + 8.4 Local gas regulation control panels
- 8.4.1
- 8.4.2
- + 9 Terminal units and medical supply units
- + 9.1 Terminal units
- 9.1.1
- 9.1.2
- 9.1.3
- 9.1.4
- + 9.2 Medical supply units
- 9.2.1
- 9.2.2
- + 10 Marking
- 10.1
- 10.2
- 10.3
- 10.4
- + 11 Pipeline installation
- + 11.1 General
- 11.1.1
- 11.1.2
- 11.1.3
- 11.1.4
- 11.1.5
- 11.1.6
- 11.1.7
- + 11.2 Location
- 11.2.1
- 11.2.2
- 11.2.3
- 11.2.4
- 11.2.5
- 11.2.6
- 11.2.7
- 11.2.8
- + 11.3 Pipeline support
- 11.3.1
- 11.3.2
- 11.3.3
- 11.3.4
- + 11.4 Installer qualifications and responsibilit...
- + 11.4.1 Installer qualifications
- 11.4.1.1
- 11.4.1.2
- 11.4.1.3
- 11.4.1.4
- 11.4.1.5
- 11.4.1.6
- 11.4.2 Installer methods and cautions
- + 11.4.3 Verification by installers
- 11.4.3.1
- 11.4.3.2
- 11.4.3.3
- 11.4.3.4
- + 11.5 Repairs, additions, and modifications to e...
- + 11.5.1 General
- 11.5.1.1
- 11.5.1.2
- 11.5.1.3
- + 11.5.2 Additions and modifications
- 11.5.2.1
- 11.5.2.2
- 11.5.2.3
- 11.5.2.4
- 11.5.2.5
- 11.5.2.6
- 11.5.2.7
- 11.5.2.8
- 11.5.2.9
- + 12 Commissioning and compliance testing
- + 12.1 General
- 12.1.1
- 12.1.2
- 12.1.3
- 12.1.4
- + 12.2 Commissioning of supply systems
- 12.2.1
- 12.2.2
- 12.3 Commissioning of medical gas pipeline dist...
- + 12.4 Compliance testing
- 12.4.1
- 12.4.2
- 12.4.3
- + 12.5 Health care facility responsibilities
- 12.5.1
- 12.5.2
- 12.5.3
- 12.5.4
- 12.5.5
- 12.5.6
- 12.5.7
- 12.5.8
- + 12.6 Inspection body responsibilities
- + 12.6.1 General
- 12.6.1.1
- 12.6.1.2
- 12.6.1.3
- 12.6.1.4
- 12.6.1.5
- 12.6.2 New systems and total replacements
- + 12.6.3 Additions and modifications
- 12.6.3.1 Supply systems
- 12.6.3.1.1
- 12.6.3.1.2
- 12.6.3.2 Pipeline distribution systems
- 12.6.3.2.1
- 12.6.3.2.2
- 12.6.3.3 Approval of completed portions
- 12.6.3.4 Non-compliance
- 12.6.3.5 Inspection of a modification
- + 12.7 Test reports and records
- 12.7.1
- 12.7.2
- + 13 Information to be supplied by the installer
- + 13.1 As-built drawings
- 13.1.1
- 13.1.2
- 13.1.3
- + 13.2 Instruction manuals
- 13.2.1
- 13.2.2
- 13.2.3
- 13.3 Maintenance schedules
- + 14 Special exemptions for small, stand-alone me...
- + 14.1 Application of this Clause
- 14.1.1
- 14.1.2
- 14.1.3
- + 14.2 Sources
- 14.2.1
- 14.2.2
- + 14.3 Control equipment
- + 14.3.1 General
- 14.3.1.1
- 14.3.1.2
- 14.3.1.3
- + 14.3.2 Shut-off valves
- 14.3.2.1
- 14.3.2.2
- + 14.3.3 Alarms
- 14.3.3.1
- 14.3.3.2
- 14.3.3.3
- 14.3.3.4
- + 14.4 Medical gas piping system
- 14.4.1
- 14.4.2
- + 15 Maintenance and ongoing verification
- + 15.1 General
- 15.1.1
- + 15.1.2
- 15.1.2.1
- 15.1.2.2
- 15.1.2.3
- 15.1.2.4
- 15.1.2.5
- 15.1.2.6
- 15.1.3
- 15.1.4
- 15.1.5
- 15.1.6
- 15.1.7
- + 15.2 Detailed requirements
- + 15.2.1 Supply systems and control equipment
- 15.2.1.1
- 15.2.1.2
- 15.2.1.3
- 15.2.1.4
- 15.2.1.5
- 15.2.1.6
- + 15.2.2 Supply system alarm panels
- 15.2.2.1
- 15.2.2.2
- + 15.2.3 Pipeline distribution system
- 15.2.3.1 Terminal units (pressure outlets and v...
- 15.2.3.2 Zone valves
- 15.2.3.2.1
- 15.2.3.2.2
- 15.2.3.3 Zone alarm panels
- Table 1*
- Table 2
- Table 3
- Table 4 – Revised Item
- Table 5
- Table 6
- Figure 1
- Figure 2
- Figure 3
- Figure 4
- Figure 5
- Figure 6
- Figure 7
- Figure 8
- Figure 9
- Figure 10
- Figure 11
- Figure 12
- Figure 13
- Figure 14
- Figure 15
- Figure 16
- + Annex A (informative)
- A.1.2 Intended use
- A.1.3 Application a) ix)
- A.3 Definitions
- + A.4.8 Dental clinics
- A.5.1.1
- A.5.1.3
- + A.5.1.4
- A.5.2.2.2
- A.5.2.2.3
- A.5.2.4.1
- A.5.2.4.2
- Table A.1
- A.5.4.1.1 c)
- A.5.4.1.2
- A.5.5.1.1
- A.5.5.2.1.1
- A.5.5.2.1.2
- A.5.5.2.1.3
- A.5.5.2.1.4
- A.5.5.2.1.5
- A.5.5.2.3.2
- A.5.5.2.3.3
- A.5.5.2.3.4
- A.5.5.2.4.2
- A.5.5.2.5 b)
- A.5.5.2.6.1
- A.5.5.2.6.3
- A.5.5.2.6.4
- A.5.5.2.6.5
- A.5.6.1.1
- A.5.6.1.2
- A.5.6.1.4
- A.5.6.2.1.1
- A.5.6.2.1.2
- A.5.6.2.1.4
- A.5.6.2.1.6
- A.5.6.2.2.2
- A.5.6.3 Receivers
- A.5.6.3 a)
- + A.5.7 Oxygen concentrator systems
- A.5.8.1.1
- A.5.8.3.4.2
- A.5.8.3.5 Receivers
- A.5.8.3.6.1
- A.5.9.1.1
- A.5.9.3.1.2
- A.5.9.3.1.3
- A.5.9.3.1.4
- A.5.9.3.1.6
- A.5.9.3.2.1
- A.5.9.3.3.1
- + A.5.10 Anaesthetic gas scavenging system (AGSS)...
- A.5.10.1.2
- A.5.10.3.1.2
- A.5.10.3.1.5
- A.5.10.3.2.1
- A.5.10.4.1
- A.6.2.1.2
- + A.6.2.2 Supply system alarms
- A.6.2.3.1
- A.6.2.4.1.1
- A.6.2.4.1.4
- A.6.2.4.2.1
- A.6.2.4.2.2
- A.6.2.4.3.1
- A.6.2.4.3.2
- A.6.2.4.3.3
- A.6.2.4.4
- A.6.3.1.2
- A.6.3.1.3
- A.6.3.1.3 c)
- A.6.3.1.5
- A.6.3.1.6
- A.6.3.1.7
- A.6.3.1.8
- A.6.3.2.1
- A.6.3.2.3
- A.6.3.3.1
- A.6.3.3.5
- + A.6.3.5 Surveillance
- A.7.1.1.1
- A.7.1.2
- A.7.1.5
- A.7.3.1
- A.7.3.2
- Figure A.1
- A.7.4.2
- + A.7.4.3
- A.7.4.5
- A.7.5.1
- A.7.6.3
- A.8.1.1
- A.8.1.3
- A.8.2.5
- A.8.2.6
- A.8.3.4
- A.8.3.5
- A.8.3.6
- A.8.3.7
- A.8.3.8
- A.8.3.11
- A.8.4.1
- + A.9.1 Terminal units
- A.9.1.4
- + A.10.4
- A.11.1.1
- A.11.1.3
- A.11.2.2
- A.11.2.3
- A.11.2.5
- A.11.2.7
- Figure A.2
- + A.11.3.2
- A.11.4.1.3
- A.11.4.3.2
- A.11.5.1.1
- A.11.5.1.2
- A.11.5.1.3
- A.11.5.2.3
- A.11.5.2.6
- A.11.5.2.7
- A.12.4.1
- A.12.5.4
- + A.12.5.8
- A.12.6.1.1
- A.12.6.3.3 Approval of completed portions
- A.12.6.3.4 Non-compliance
- A.13.1.1
- A.13.1.3 Installer qualifications
- A.14.1.1
- + A.14.2 Sources
- A.14.3.1.1
- A.14.3.1.2
- + A.15.1.1
- A.15.1.2.6
- A.15.1.3
- A.15.1.4
- A.15.1.5
- + A.15.1.6
- A.15.2.1.1
- A.15.2.1.2
- A.15.2.1.5
- A.15.2.1.6
- A.15.2.2 Supply system alarm panels
- A.15.2.3.1 Terminal units (pressure outlets and...
- A.15.2.3.2.2
- A.15.2.3.3 Zone alarm panels
- A.Table 2
- + Table A.2
- A. B.3.3 Cross-connection test — Method 2
- Table A.3
- A. C.3 Nominal distribution pressures and typi...
- A. Table C.1, 5.1.3
- A. Table C.1, 5.6.2.1.1
- A. D.1.2
- A. D.4 Visual test for particulate contaminati...
- A. D.5.2 c) D.5.3 c)
- + Table A.4
- A. D.6.4.4
- + A. Table D.4
- A. H.1.1
- A. H.1.2
- A. H.1.3
- A. H.1.4
- A. H.1.8
- A. I.2 Removal of components
- A. I.3 Replacement of components
- A. J.1 General
- + Annex B (normative)
- B.1 General
- + B.2 Leak tests
- B.2.1
- B.2.2
- B.2.3
- B.2.4
- B.2.5
- B.2.6
- + B.3 Cross-connection tests
- B.3.1 General
- B.3.2 Cross-connection test — Method 1
- B.3.3 Cross-connection test — Method 2
- B.3.4 Cross-connections
- + Annex C (normative)
- C.1 General
- C.2 Typical supply system alarms
- C.3 Verification of health care facility record...
- C.4 Functional tests of all sources
- C.5 Detailed inspection of supply systems
- Table C.1
- C.6 Detailed inspection of supply system alarm
- Table C.2
- + C.7 Odour test for air supplied by air compress...
- C.7.1
- C.7.2
- + C.8 Test for minor components from supply syste...
- C.8.1 General
- C.8.2 Method
- C.8.3 Test for particulates
- C.8.4 Certification
- + Annex D (normative)
- + D.1 General
- D.1.1
- D.1.2
- D.1.3
- D.1.4
- + D.2 Inspection of terminal units, junction poin...
- D.2.1
- D.2.2
- D2.3
- D.2.4
- D.2.5
- D.2.6
- Table D.1
- D.2.7
- D.2.8
- D.2.9
- D.2.10
- D.2.11
- Table D.2
- D.3 Detailed inspection of zone alarms
- Table D.3
- D.4 Visual test for particulate contamination o...
- Figure D.1
- + D.5 Test for gas identity/cross-connection
- D.5.1
- D.5.2
- D.5.3
- D.5.4
- D.5.5
- D.5.6
- + D.6 Check of terminal units
- D.6.1 Identification
- D.6.2 Location
- + D.6.3 Mechanical function and gas specificity
- D.6.3.1
- D.6.3.2
- D.6.3.3
- + D.6.4 Test for contaminants from pipelines
- D.6.4.1 General
- D.6.4.2 Method of test
- D.6.4.3 Test for particulates
- + D.6.4.4 Certification
- D.6.4.4.1
- D.6.4.4.2
- + D.6.5 Minimum flow requirements of installed te...
- + D.6.5.1 Flow resistance
- D.6.5.1.1
- D.6.5.1.2
- D.6.5.1.3
- D.6.5.1.4
- D.6.5.1.5
- + D.6.5.2 Procedure to determine flow characteris...
- D.6.5.2.1
- D.6.5.2.2
- D.6.5.2.3
- D.6.5.2.4
- D.6.5.2.5
- + D.6.5.3 Additional testing
- D.6.5.3.1
- D.6.5.3.2
- D.6.5.3.3
- D.6.5.3.4
- D.6.5.3.5
- D.6.5.4 Performance verification
- D.6.6 Labels
- Table D.4
- + Annex E (informative)
- E.1
- E.2
- E.3
- E.4
- E.5
- Table E.1
- E.6
- E.7
- E.8
- E.9
- E.10
- E.11
- Table E.2
- Table E.3
- Table E.4
- Table E.5
- Figure E.1
- Figure E.2
- Figure E.3
- Figure E.4
- Figure E.5
- Figure E.6
- + Annex F (informative)
- Table F.1
- Table F.2
- + Annex G (normative)
- Table G.1
- + Annex H (informative)
- + H.1 General
- H.1.1
- H.1.2
- H.1.3
- H.1.4
- H.1.5
- H.1.6
- H.1.7
- H.1.8
- H.1.9
- H.2
- + Annex I (normative)
- Figure I.1
- I.1 General
- I.2 Removal of components
- I.3 Replacement of components
- + I.4 Possible actions and examples
- I.4.1 Additions
- I.4.2 Maintenance
- I.4.3 Modification
- I.4.4 Repair
- + Annex J (normative)
- J.1 General
- J.2 Example of a compliance form
- Figure J.1
- + Annex K (informative)
- K.1
- Figure K.1
- + Annex L (informative)
- Figure L.1
- + Annex M (informative)
- M.1
- M.2
- M.3
- M.4
- M.5
- + Annex N (informative)
- + N.1 General
- N.1.1
- N.1.2
- + N.2 Communication
- N.2.1
- N.2.2
- N.2.3
- + N.3 Conservation of gas supplies
- N.3.1
- N.3.2
- N.3.3
- + N.4 Remedial actions
- N.4.1
- N.4.2
- N.4.3
- + N.5 Training and procedures
- N.5.1
- N.5.2
- N.5.3
- + N.6 Additional cylinder reserves
- N.6.1
- N.6.2
- Figure N.1
- + Annex O (informative)
- O.1
- O.2
- + Annex P (informative)
- P.1 General
- + P.2 Nitrous oxide
- P.2.1
- P.2.2
- P.2.3
- P.3 Inhalation anaesthetics
- P.4 Energy consumption
- P.5 Water consumption
- + Annex Q (informative)
- Q.1
- Q.2
- + Annex R (informative)
- R.1 Scope
- R.2 Definitions
- + R.3 Central stationary systems
- R.3.1 General
- R.3.2 Components
- R.3.3 System flow rate
- R.3.4 System characteristics
- + R.4 Supply system for central plume evacuation
- R.4.1
- R.4.2
- R.4.3
- R.4.4
- R.4.5
- R.4.6
- R.4.7
- R.4.8
- R.4.9
- R.5 Indicating systems
- + R.6 Plume extraction system pipeline
- R.6.1 Mechanical integrity
- + R.6.2 Pressures and flows
- R.6.2.1
- R.6.2.2
- R.6.2.3
- R.6.2.4
- R.6.3 Shut-off valves
- + R.7 Terminal units
- R.7.1
- R.7.2
- + R.8 Marking and colour coding
- + R.8.1 Marking
- R.8.1.1
- R.8.1.2
- R.8.1.3
- R.8.2 Colour coding
- + R.9 Tests, inspections, and checks of a fixed (...
- R.9.1 General
- + R.9.2 Leakage
- R.9.2.1
- R.9.2.2
- R.9.3 Mechanical function and inspection for cl...
- R.9.4 Function of flow-generating devices
- R.9.5 Pressure and flow at terminal units
- R.9.6 Control system
- R.9.7 Exhaust system
- R.9.8 Identification and labelling of the termi...
- R.9.9 Test for durability of markings and colou...
- R.9.10 Certification of the central PES system
- R.9.11 Extensions or modifications
- Figure R.1
- Figure R.2
- + Annex S (informative)
- S.1 Responsibilities for medical gas quality
- + S.2 On-site manufacture
- S.2.1 General
- S.2.2 Equipment
- S.3 Quality management system
- + S.4 Responsibilities
- S.4.1 Health care facility responsibility
- S.4.2 Manufacturing responsibility
- S.4.3 Quality control responsibility
- + S.5 Quality control
- S.5.1 On-line testing
- S.5.2 Continuity of supply
- S.5.3 Quality specification
- Table S.1
- + Annex T (normative)
- + T.1 Qualified installer
- T.1.1 Definition
- T.1.2 General
- + T.2 Qualified operator
- T.2.1 Definition
- T.2.2 Professional training and education
- T.2.3 Knowledge
- T.2.4 Experience
- T.2.5 Roles and responsibilities (typical)
- + T.3 Qualified service technician
- T.3.1 Definition
- T.3.2 Professional training and education
- T.3.3 Experience
- T.3.4 Roles and responsibilities (typical)
- + T.4 Qualified manufacturer
- T.4.1 Definition
- T.4.2 Qualifications
- T.4.3 Roles and responsibilities (typical)
- + Annex U (normative)
- Table U.1
1 Scope
1.1 General
This Standard specifies safety requirements for pipelines for medical gases, medical vacuum, medical support gases, and anaesthetic gas scavenging systems in health care facilities, both public and private. It applies to all facilities providing health care services, regardless of type, size, location, or range of services, including, but not limited to
a) acute care hospitals;
b) in-patient continuing care hospitals;
c) long-term care facilities;
d) community-based providers;
e) leased/rental suites in office buildings; and
f) ambulatory and outpatient care clinics (e.g., day surgery, endoscopy clinics, dentists’ offices, and doctors’ offices).
1.2 Intended use
There is a commentary available for this Clause.
This Standard is intended for use by anyone involved in the design, installation, commissioning and testing, documentation, operation, and maintenance of pipelines for medical gases, medical vacuum, medical support gases, and anaesthetic gas scavenging systems. The requirements cover
a) the design of systems to ensure the continuous supply of gas or vacuum in normal condition or in single fault condition;
b) the selection of materials and components;
c) the non-interchangeability of equipment between different gas systems and services;
d) the cleanliness of materials and components and of the completed system;
e) installation procedures for supply systems and pipelines;
f) the configuration of system components;
g) control, monitoring, and alarm systems;
h) the markings and information to be supplied by the manufacturer or installer;
i) contaminant testing of pipelines;
j) the final testing of each medical gas pipeline prior to its use in patient care to ensure that it contains only the specified gas; and
k) maintenance and ongoing verification.
1.3 Application
There is a commentary available for this Clause.
This Standard applies to pipeline systems for
a) medical gases or medical gas mixtures, including
i) oxygen USP;
ii) oxygen 93 USP;
iii) medical air USP;
iv) nitrous oxide USP;
v) carbon dioxide USP;
vi) helium USP;
vii) oxygen USP/nitrous oxide USP mixtures;
viii) helium USP/oxygen USP mixtures; and
ix) other medical gases;
b) medical support gases, including
i) instrument air; and
ii) nitrogen NF;
c) medical vacuum; and
d) anaesthetic gas scavenging systems (AGSS).
1.4 Exclusion of plume evacuation systems (PES)
This Standard does not provide specific requirements for plume evacuation systems (PES) that is part of an overall medical gas pipeline distribution system. Informative guidance is provided in Annex R.
1.5 Exclusion of hyperbaric chambers
This Standard does not provide specific requirements for hyperbaric chambers connected to medical gas pipeline distribution systems. See Clause 7.6.4 for the hyperbaric demarcation point.
Note: Requirements for hyperbaric chambers are provided in CSA Z275.1.
1.6 Exclusion of veterinary and animal research facilities
This Standard does not apply to veterinary and animal research facilities.
Note: The relevant requirements of this Standard, particularly those regarding safety, should be incorporated in the design, installation, and maintenance of piping systems in veterinary and animal research facilities. These systems should be inspected and tested by inspection bodies.
1.7 Terminology
In this Standard, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the standard.
Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material.
Notes to tables and figures are considered part of the table or figure and may be written as requirements.
Annexes are designated normative (mandatory) or informative (nonmandatory) to define their application.
1.8 Units of measure
The values given in SI (metric) units are the standard. The values given in parentheses are for information only. Unless otherwise specified, pressures and vacuum in this Standard are expressed as gauge pressure (i.e., atmospheric pressure is defined as 0).
You may comment on any section of this document by clicking the “Submit Comment” link at the bottom of the relevant section.