Draft Details

Designation:CSA IEC 61000-4-18
Source:CSA
Contact name:Walker Stewart
Review start date:Mar 30, 2026
Review end date:May 29, 2026
Categories:Electrical
Contact email:robin.chevalier(at)csagroup.org
Associated materials (click link to download). You will need to be logged in to download any files:

Adobe Acrobat For PDF files, Adobe Acrobat Reader can be downloaded from the Adobe website.

Draft Scope/Description:

1. Scope

IEC 61000-4-18: 2019 focuses on the immunity requirements and test methods for electrical and electronic equipment, under operational conditions, with regard to:
a) repetitive slow damped oscillatory waves occurring mainly in power, control and signal cables installed in high voltage and medium voltage (HV/MV) substations;
b) repetitive fast damped oscillatory waves occurring mainly in power, control and signal cables installed in gas insulated substations (GIS) and in some cases also air insulated substations (AIS) or in any installation due to high-altitude electromagnetic pulse (HEMP) phenomena.
The object of this document is to establish a common and reproducible reference for evaluating the immunity of electrical and electronic equipment when subjected to damped oscillatory waves on supply, signal, control and earth ports. The test method documented in this part of IEC 61000 describes a consistent method to assess the immunity of an equipment or system against a defined phenomenon. NOTE As described in IEC Guide 107, this is a basic EMC publication for use by product committees of the IEC. As also stated in Guide 107, the IEC product committees are responsible for determining whether this immunity test standard is applied or not, and if applied, they are responsible for determining the appropriate test levels and performance criteria. The document defines:
- test voltage and current waveforms;
- ranges of test levels;’
- test equipment;
- calibration and verification procedures of test equipment;
- test setups;
- test procedure.

You may comment on any section of this document by clicking the “Submit Comment” link at the bottom of the relevant section.