Draft Details

S6 - Section 4 - Seismic design
Designation:S6 Canadian Highway Bridge Design Code (New Edition)
Review end date:Nov 14, 2023
 
This draft is no longer available to be viewed. The comments that have been made on it have been collected, and will be considered by the committee responsible for the draft.