Draft Details

Supplement No. 1 to N285.0:23, General Requirements for pressure-retaining systems and components in CANDU nuclear power plants (Technology Neutral Requirements)
Designation:CSA N285.0 S1:26
Review end date:Jul 28, 2025
 
This draft is no longer available to be viewed. The comments that have been made on it have been collected, and will be considered by the committee responsible for the draft.