Draft Details

Designation:CSA R122
Source:CSA
Contact name:Zaeem Khalid
Review start date:Jul 18, 2024
Review end date:Sep 16, 2024
Contact email:thuy.ton(at)csagroup.org
Draft Scope/Description:

0.1 General

This Standard provides a common set of safety indicators for use in process, operations, and safety management for passenger and transit railway systems in Canada.

0.2 Terminology

In this Standard, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the Standard.

Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material.

Notes to tables and figures are considered part of the table or figure and may be written as requirements.

Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

0.3 Units of measure

This Standard uses SI units as the units of record. All values reported shall include a unit of measurement.

You may comment on any section of this document by clicking the “Submit Comment” link at the bottom of the relevant section.