Draft Details

Designation:C22.2 NO. 61010-2-091
Source:IEC
Review start date:May 14, 2019
Review end date:Jul 13, 2019
Categories:Electrical
Contact email:mary.morgan(at)csagroup.org
Associated materials (click link to download). You will need to be logged in to download any files:

Adobe Acrobat For PDF files, Adobe Acrobat Reader can be downloaded from the Adobe website.

Draft Scope/Description:

Scope:

This IEC second edition cancels and replaces the first edition published in 2012. This edition constitutes a technical revision.

This edition includes the following significant technical changes with respect to the previous edition:

a) The scope of the document has been clarified and limited to equipment below 500 kV.
b) Additional marking requirements for X-ray generating assemblies have been added.
c) Requirements for high-voltage cables used in the X-ray assembly have been added.
d) Insulation requirements have been added.
e) Temperature requirements for beam-limiting devices have been added.
f)  Clarification has been provided on PROTECTED EQUIPMENT and PARTIALLY PROTECTED EQUIPMENT, and test methods
g) Requirements for INTERLOCKS have been modified, taking into account functional safety standards.
h) Requirements for reasonably foreseeable misuse have been clarified.
i)  Risk assessment has been made mandatory for specific aspects.

This Part 2-091 is to be used in conjunction with the latest edition of IEC 61010-1. It was established on the basis of the third edition (2010) and its Amendment 1 (2016), hereinafter referred to as Part 1.

This Part 2-081 supplements or modifies the corresponding clauses in IEC 61010-1 so as to convert that publication into the IEC standard: Particular requirements for cabinet X-ray systems.

Where a particular subclause of Part 1 is not mentioned in this Part 2-081, that subclause applies as far as is reasonable. Where this Part 2-011 states "addition", "modification", "replacement", or "deletion" the relevant requirement, test specification or note in Part 1 should be adapted accordingly.

You may comment on any section of this document by clicking the “Submit Comment” link at the bottom of the relevant section.