Draft Details

Design procedures for seismic qualification of nuclear power plants (New Edition)
Designation:N289.3
Review end date:Aug 28, 2019
 
This draft is no longer available to be viewed. The comments that have been made on it have been collected, and will be considered by the committee responsible for the draft.